Contractor for University Facility

Lincoln, UK

The University of Lincoln put out a tender for the construction of a new advanced engineering research and development facility. The Bridge R&D building is designed to be a collaborative research facility acting as a bridge between industry partners and the University. 
The facility, situated adjacent to the Lincoln Science and Innovation Park, will include a series of laboratory spaces housing specialist equipment such as a Transmission Electron Microscope and all spaces purpose built to reduce interference with external factors to the equipment within the building.
1. Electron Microscopy Lab
2. Clean Room (ISO Class 6)
3. Wet Lab
4. Dry Lab
5. Materials Lab
At approx. 750sqm, the design of the building has been completed to RIBA Stage 4. The University is conducting a below OJEU two stage procedure including a Shortlisting Questionnaire, followed by a second tender stage for the shortlisted contractors.

Estimated project budget: £1m

To receive the full details of this exciting project, and to be considered to pitch, then please either sign up for Meet Hugo or get in touch with our team below to discuss this further.

Request Project Details











Book A Demo

Key Sector Stats

We care about your ROI. See the key stats below for the construction sector on our platform.

%

Close a deal in first 3 months

Projects Won In 2020

Average Project Size